Aljassmi, H, Han, S and Davis, S (2014) Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. Journal of Construction Engineering and Management, 140(01).

Casanovas, M d M, Armengou, J and Ramos, G (2014) Occupational Risk Index for Assessment of Risk in Construction Work by Activity. Journal of Construction Engineering and Management, 140(01).

Chang, C (2014) Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique. Journal of Construction Engineering and Management, 140(01).

Choi, S, Kim, D Y, Han, S H and Kwak, Y H (2014) Conceptual Cost-Prediction Model for Public Road Planning via Rough Set Theory and Case-Based Reasoning. Journal of Construction Engineering and Management, 140(01).

González, P, González, V, Molenaar, K and Orozco, F (2014) Analysis of Causes of Delay and Time Performance in Construction Projects. Journal of Construction Engineering and Management, 140(01).

  • Type: Journal Article
  • Keywords: Project management; Delay time; Construction management; Scheduling; Costs; Activity delays; Project planning; Reasons for noncompliance; Relationship; Time performance; Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000721
  • Abstract:
    Activity delays are a common issue in the construction industry and can increase project schedules and costs. Recent research efforts have focused on the quantitative evaluation of delay impacts. The literature suggests that the construction industry is in need of additional research to systematically relate the causes of delays to their impacts. To overcome this limitation, this paper analyzes delay causes in activities that were not completed as scheduled. The paper contributes to a methodology to examine the qualitative (delay causes) and quantitative (time performance) dimensions of the delay issue. The paper proposes two indicators, as follows: (1) reason for noncompliance (RNC) as an indicator that characterizes scheduling failures, and (2) delay index (DI) as a time-performance indicator that describes the impacts of delay on critical and noncritical activities. The paper presents two building projects as case studies, with planning and subcontractors as the primary RNCs that have the greatest impact on time performance. Planning was the most harmful delay cause on time performance.

Laryea, S and Lubbock, A (2014) Tender Pricing Environment of Subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(01).

Ling, F Y Y, Ke, Y, Kumaraswamy, M M and Wang, S (2014) Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Journal of Construction Engineering and Management, 140(01).

Narbaev, T and De Marco, A (2014) Combination of Growth Model and Earned Schedule to Forecast Project Cost at Completion. Journal of Construction Engineering and Management, 140(01).

Ning, Y and Ling, F Y Y (2014) Boosting Public Construction Project Outcomes through Relational Transactions. Journal of Construction Engineering and Management, 140(01).

Panas, A and Pantouvakis, J P (2014) Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations. Journal of Construction Engineering and Management, 140(01).

Rosenfeld, Y (2014) Root-Cause Analysis of Construction-Cost Overruns. Journal of Construction Engineering and Management, 140(01).

Sun, C, Mackley, A and Edara, P (2014) Programmatic Examination of Missouri Incentive/Disincentive Contracts for Mitigating Work Zone Traffic Impacts. Journal of Construction Engineering and Management, 140(01).

Syal, M, Duah, D, Samuel, S, Mazor, M, Mo, Y and Cyr, T (2014) Information Framework for Intelligent Decision Support System for Home Energy Retrofits. Journal of Construction Engineering and Management, 140(01).

Yang, I, Lin, Y and Lee, H (2014) Use of Support Vector Regression to Improve Computational Efficiency of Stochastic Time-Cost Trade-Off. Journal of Construction Engineering and Management, 140(01).

Zhang, S, Du, C, Sa, W, Wang, C and Wang, G (2014) Bayesian-Based Hybrid Simulation Approach to Project Completion Forecasting for Underground Construction. Journal of Construction Engineering and Management, 140(01).